Our Clients

AIBEL- Eaton Valves supplied BP/Sonatracht In Ameanas Project
AKER ENGINEERING – Perar supplied Aker with Ball valves up to 12” class 2500 for Conoco Banff in Duplex SS and 6 Mo materials.
ABB LUMMUS GLOBAL – Perar supplied Ball valves for QGPC/ Al Shaheen Development. Also they supplied up to 20” class 2500 for the Smedvig West Omikron and Ekofisk Developments.
AIR PRODUCTS- Solent & Pratt have supplied High Performance butterfly valves for Gas production plant Projects such as Pernis, Tabriz, Ghent, LLanwern, Maghara, Duisberg.
AKER KVAERNER – Perar supplied £5 million of ball valves up to 18” class 2500 for Texaco Captain. Also A similar quantity was supplied for BP Bruce Phase 2 up to18”. Solent & Pratt Have supplied Aker Kvaerner for Norwegian projects such as Kvitebjorn & Kirstin.
AMEC – Curtiss Wright and Alco supplied the GDF Cygnus Project. Perar have supplied Amec for projects such as Shell Kingfisher (up to 10” API 10,000 valves).Alco supplied all Double block & Bleed and Monoflanges for Shell Curlew. Farris have supplied all Relief valves for Sakhalin Island 2 to Amec and Parson for both the onshore and offshore portions. Solent & Pratt supplied £650,000 of High Performance Butterfly valves for GDF Cygnus Project.
BECHTEL – Perar supplied Chevron Wheatstone LNG Plant. Curtiss Wright supplied the Khursiniyah project. Eaton Valves supplied A $600,000 piping package for Saffron / Scarab.. Farris supplied all relief valves for the OGD 3 project and AGD2 project via Bechtel.
BURULLUS GAS – Eaton Valves supplied $600,000 of pipe, valves, fittings, flanges, gaskets, flame arrestor for the Saffron / Scarab project.
CB& I – Perar supplied Ball Valves up to 20” class 2500 for BP Bruce phase 2. Perar also supplied Phillips Janice/Judy-Joanne Tie-in and the Triton FPSO. Alco supplied £1.8 million of DBB valves for the Buzzard project. Farris Supplied relief Valves for the South Caucasus project. Curtiss Wright supplied Butterfly valves for South Caucasus.
FLUOR DANIEL –

Perar supplied the Exxon Neftegas Project and the Chevron Tengis project. Curtis Wright supplied butterfly valves up to 48” in Inconel for the Habshan project. Eaton valves supplied Yansab with Top up valves and fast delivery requirements.
FOSTER WHEELER – Perar supplied the Discovery Junction Facilities Development. Solent & Pratt supplied £300,00 of butterfly valves for Conoco Humberside refinery upgrade. Solent & Pratt supplied Butterfly valves up to 30” to the Sriracha refinery and Aromatic Project for Exxon Thailand and Valves up to 48” for the Sharq project.
GDF – S & P supplied the Cygnus project with a large Super Duplex triple offset butterfly package via Amec.

GENESIS – Solent & Pratt supplied Genesis large Super Duplex triple offset butterfly package for BP Block 18 Angola

HYUNDAI HHI– Perar supplied the Carigali Booster Compression Project. Curtiss Wright Supplied all butterfly valves on the Goliat project.
JP KENNY – Perar supplied Subsea Ball Valves up to 48” class 600 for BP Bombax project, value $2 million.
KBR – Perar supplied $20 Million for Quad 204 and Curtiss Wright $18 Million. Curtiss Wright supplied over £10 million for the AIOC Azeri Project, Chirag Oil Project, BP Saqqara project. Farris supplied relief Valves for AIOC Shah Deniz. Alco supplied all DBB’s for BP Forties Delta and BP Saqqara. KBR/MW Kellogg – Farris supplied all Relief Valves for the Damietta Project. Perar supplied Top Entry ball valves up to 40” class 600.

SAMSUNG – Perar supplied Teekay Petrojarl for the Jordbaer FPSO Topsides Project , Banyu Urip,

Shaybah Phase 2 and 4 and Ichthys project.

SMOE- Curtiss Wright Supplied all butterfly valves for Ivar Aasen

TECHNIP (SHAW STONE & WEBSTER)- Solent & Pratt supplied Sharq with butterfly valves up to 60”. Perar supplied the Petronas MTBE Dehydrogenation project.

TECHNIP – Perar supplied the Shell Prelude FLNG Project

WORLEY PARSONS – Perar supplied Christina Lake Well Pads 3A
END USERS

ADCO- Solent & Pratt supplied valves up to 54” for ADCO Borouge. Perar supplied £3.5 million of ball valves for OGD545.
AIOC – Eaton valves have supplied Hotshot Bolting worth £50,000 for the Azeri Drilling Platforms and also butterfly valves valued at £30,000 on a Hotshot delivery. Solent & Pratt have supplied £3 million of butterfly valves for various phases of the Azeri project.
AMERADA HESS – Perar supplied the Triton Project. Alco supplied DBB valves for the Dauntless & Durward project.
ARAMCO – Curtiss Wright supplied the Khursiniyah project via Bechtel. Perar supplied the East West Pipeline, SRG-2 Expansion Project, Khurais

BP – Curtiss Wright supplied all Butterfly valves for Chirag Oil Project, Sangachal Terminal and $18 Million for Quad 204. Curtiss Wright were appointed to solve butterfly valve problems on Block 18 Angola FPSO. Perar supplied $20 Million of ball valves for Quad 204. Also the largest ball valve we have made (60” class 600) for Arco Alaska. Alco supplied DBB valves for Mad Dog and Atlantis , Horn Mountain, Southern North Seas Project and Block 18. Farris have supplied all relief valves for the Shah Deniz Project.
BRITISH GAS- Solent & Pratt supplied all butterfly valves for the Rough Project. Solent & Pratt supplied valves up to 24” class 600 for British Gas Hannibal / Miskar. Perar supplied valves for North Morecambe and the Juno Projects.
BORD GAIS IRELAND- – Perar supplied 3,000,000 Euros of pipeline ball valves up to 36” for the “Pipeline to the West”.
BURULLUS GAS – Eaton Valves supplied a $600,000 piping package including valves, pipe, fittings, flanges, gaskets, bolting for Saffron / Scarab.
CHEVRON UK- Alco supplied DBB valves for the Ninian project.
CONOCO PHILLIPS – Solent & Pratt supplied £450,000 of High Performance Butterfly valves for Britannia. Perar supplied Bayu Undan Phase 3.
DET NORSKE- Curtiss Wright Supplied all butterfly valves for Ivar Aasen

DUPONT – Solent & Pratt have supplied to the T8 and T11 PTA plants plus the Sinopec PTA plant.
ENQUEST- Alco supplied DBB Valves for the Kraken Project and Knightsbridge.

ENI- Curtiss Wright Supplied all butterfly valves on the Goliat project. Perar supplied the Greenstream project for Libya with 34” Top Entry Ball Valves, Value £1.5 million.
EXXONMOBIL- Perar supplied Kizomba B Via Hyundai, EM Kizomba B TLP via Daewoo
FAIRFIELD – Alco Supplied the Dunlin Project

GASCO- Perar supplied the Giza North Power Project

Solent & Pratt supplied butterfly valves up to 48” in Inconel for the Habshan project. Farris supplied all relief valves for the OGD 3 project and AGD2 project via Bechtel.
GDF SUEZ- Curtiss Wright Supplied all butterfly valves for the Cygnus Project. Alco supplied all DBB Valves.

GAZPROM- Perar supplied the Charvuta project
INPEX _ Perar supplied the Ichthys project

KUWAIT OIL COMPANY- Perar supplied valves up to 48” class 600 for the Crude Oil Transfer Pipeline.
MAERSK – Alco Supplied the Gryphon Project. Perar supplied the Tyra West, Platform F, Harald Project and the Tyra East Project with fully welded ball valves for subsea service.
MARATHON OIL – Perar supplied West Brae. Alco supplied DBB valves for the Kingfisher project.
MCDERMOTT – Perar supplied Safaniya Phase 2

NATIONAL GRID– Perar have supplied the following projects with valves up to 48” class 600 . Murphy for the Cambridge to Matching Green Pipeline/Brecon to Tirley/Ganstead to Asselby/Bathgate to Newarthaill/Easington to Ganstead and Entrepose for Aberdeen to Lochside/Pannal to Netherkellet/Asselby to Panall. McAlpine for the Lower Quinton Pipeline. Beckton Power Station
MARATHON- Alco Supplied East Brae Devenick project

NEXEN – Alco supplied £1.8 million of DBB’s for the Buzzard project. Alco Supplied Golden Eagle and Rochelle Projects.
PDO OMAN – Alco have the blanket supply agreement to supply PDO with all monoflanges.
PHILLIPS PETROLEUM Perar supplied up to 20” class 2500 for the Smedvig West Omikron and Ekofisk Developments. Perar supplied $3 million of Ball Valves up to 24” class 2500 for the Bayu Undan project. Fergus and British Gas Amethyst.
PREMIER OIL – Curtiss Wright Supplied Solan Project.

ONGC – Alco Supplied Dean Dayal.

QGPC – Perar supplied the North Dome Project. Alco supplied DBB valves for the QGPC/Dukhan project.
RAMCO – Alco supplied all modular DBB valves for the Seven Heads project
SAGA PETROLEUM – Alco supplied DBB valves for Varg.
Sonatrach/Amerada Hess – Perar supplied SonaHess Gas Compression. Farris Supplied In Ameanas
SHARQ- Solent & Pratt supplied Sharq with butterfly valves up to 60” via Foster Wheeler and Stone & Webster.
SHELL – Alco supplied DBB valves for F23 & F28, Shell Shearwater, Sarawak and Mallard. Farris have supplied all Relief valves for Sakhalin Island 2 to Amec and Parsons for both the onshore and offshore portions. Perar supplied Draugen and Kingfisher and Prelude FLNG Project.
STATOIL – Perar supplied the Sleipner project. Curtiss Wright supplied the Mariner, Aasta Hasteen. Alco supplied the Ekofisk project
TALISMAN – Alco supplied the Claymore Project.

TENGIZCHEVROIL – Perar supplied TCO with 40” class 600 pipeline valves.
TEXACO – Perar and Alco supplied the Captain phase 2 project.
TOTAL – Alco supplied L4A Platform. Solent & Pratt supplied £1 million of Triple Offset butterflies for Elgin/Franklin.
UNION FENOSA – Farris supplied all Relief Valves for the Damietta Project. Perar supplied Top Entry ball valves up to 40” class 600. Eaton Valves supplied stock valves for site hotshot requirements.
WOODSIDE – Perar supplied Echo Yodel Upper E subsea, Angel Gas Project, Perseus over Goodwyn Subsea, TOT project. Curtiss Wright Supplied North Rankin.
ZADCO – Alco Supplied the Satah Project